The Austin|Sundt Joint Venture is actively preparing for construction of the new San Diego International Airport Rental Car Center (RCC), which is scheduled to begin by the end of 2013. Austin|Sundt, along with the San Diego International Airport Authority, is seeking your assistance in recruiting qualified S/D/M/WBE and DVBE subcontractors, and material and/or equipment suppliers. Construction is expected to take 24 months and the end result will be a new rental car center for San Diego consolidating the rental car operators under one roof.

The RCC project is approximately $220M with trades to include the following (subject to change):

Survey
Site Clearing/Grubbing
Grading, Trucking
Traffic Control
Utilities Locator
Sewer
Temp Facilities Set Up
Temp Power
Temp Water
Pedestrian Bridge Demo
UG Utilities
Deep Foundation Pile System
Fuel & Fluid Storage Distribution Systems
Concrete Supplier
Concrete pumper
Concrete Washout
Reinforcing Steel
Crane
Fire Sprinklers
Conveying Systems
Mechanical, Electrical & Low Voltage
Plumbing
Exterior Glazing
Structural Steel
Metal Decking
Misc. Metals and Metal Stairs
Masonry
Insulation
Flooring
Finish Carpentry
Trash Chutes
Signage
Wayfinding
Fireproofing
Landscape & Irrigation
Roofing
Painting & Coatings
Railings
Site Fencing
Finish Grading
Misc. Site Improvements
Metal Stud Framing & Drywall
Toilet Partitions & Accessories
Architectural Hardscape
Curb & Gutter
Decorative Metals
Acoustical Ceilings
Misc. Specialties
Seismic Joint Covers
Terrazzo
Casework
Parking Equipment
AC Paving
Deck Coatings
Doors/Frames/Hardware

They are currently seeking subcontractors, as well as L/S/D/M/WBE and DVBE material and/or equipment suppliers.
 
All firms are required to visit: http://www.san.org/sdcraa/business/northside/rcc.aspx and follow Steps 1 and 2. 
 
The first three (3) Early Release Packages include, but are not limited to, the following scopes of work: 
 
  • Pedestrian Bridge Demolition: Demolition, Equipment Rentals, Trucking, Traffic Control, Saw Cutting, Dust Control
  • Tower & Mobile Cranes & Personnel Hoists 
  • Temporary Power
 
Submit On-Line Pre-Qualification package for above early release packages no later than end of business on May 17, 2013.
  
PLEASE LIST THE PROJECT NAME AS "RCC" WHEN YOU REGISTER and PREQUALIFY
 
A bid date has not yet been established. The plans and specifications are NOT available for review at this time. After registering your business, you will be notified when opportunities arise in your field of work.
 
For assistance with completing the pre-qualification, please email your North San Diego SBDC Consultant, Cheryl Brown at Cheryl@sbdcconsultant.com.
  
Sincerely,
De Anna Andrews, Small Business Development Manager
Austin|Sundt JV
F. 619-321-4948

 
 
 
 

2 comments:

  1. IF you want to hire Royal Ride Car in affordable price.Airport And Train Station Pick and drop service is available.Contact Us Now
    car service annapolis md

    ReplyDelete
  2. Your are looking dulles airport limousine service in Washington Dc Then Contact us to hire our Service in Low Rates!!!

    ReplyDelete