Thursday, April 28, 2011

REQUEST FOR CERTIFIED SBE / DBE / UDBE / SDB

REQUEST FOR CERTIFIED SBE / DBE / UDBE / SDB
by
USSBA, Caltrans, UCP, DEVO, SCOOP
SUBCONTRACTORS AND SUPPLIERS FOR:

SAN DIEGO COUNTY WATER AUTHORITY (PROJECT OWNER)
PIPELINE 3 AND 4 MIRAMAR HILL TO SCRIPPS RANCH RELINING PROJECT
SPECIFICATION NO. 606

Bid Date & Time:  May 10, 2011 at 2:00 p.m.Project Location: Between Miramar Hill in the community of Mira Mesa and the San Diego 5 Flow Control Facility in Scripps Ranch, San Diego County, CA

Project Description: Relining of approx. 15,000 LF of existing Pipeline 3 & 4 PCCP using steel liner pipe and appurtenant work.

L. H. Woods & Sons, Inc. is accepting quotes for the following work (but not limited to): 
Survey, temp. fence, pipe, cathodic protection, painting, hydroseeding, erosion control, annular grouting, carbon fiber lining, welding, non-destructive testing, shoring, concrete, mortar lining, precast concrete structure, and rebar.

Contact: Teresa Woods
2115 La Mirada Drive, Vista CA  92081
Phone: (760) 599-5500   
Fax: (760) 599-5510

Performance/payment bonds may be required.  LHWS can offer referral assistance to qualified subcontractors in obtaining bonds, lines of credit, and/or insurance. Plans and specs are available for review in our office 8:00 am-5:00 pm or for purchase/review from SDCWA (858) 522-6804.

No comments:

Post a Comment